If you are interested, you can download our two-fold Technical Specifications brochure, in which you will find this and other information:
Download the MECASOLAR products Technical Datasheet from our website
| Tracking Axes | 2 AXES: Horizontal and Vertical |
| Maximum module weight | 1,100 Kg |
| Tracking system maximum module powe | Up to 12 kWp (as a function of module power and number of modules) |
| Vertical and horizontal axis rotation angle | Vertical Axis: 240º (-120º to +120º) and Horizontal Axis: 60º |
| Remote control | Optional |
| Operating voltage or output current | 400 V three-phase |
| Motor power consumption | 100 kWh / year |
| Voltage supply | 400 V Trifásico |
| East West movement | Accomplished by gearmotor and cogged crown wheel |
| Tracking system height – Panels | Horizontal |
| Weight without modules and foundation | 2,000 kg (3,000 kg with modules) |
| Structure material | Hot-dipped galvanised steel |
| Rotation on vertical axis | Electromechanical actuation by planetary gearmotor |
| Rotation on horizontal axis | Electromechanical actuation by linear actuator |
| V-shaped support structure | On cogged crown wheel |
| Rotation bearing | Cogged, each 3’ advances one cog |
| Inverter Electrical Cabinets | Metallic, weather-tight, ventilated, fully wired and with capacity for three IP66 inverters (only for MS TRACKER 10) in case the client installs other inverters |
| Electrical Cabinet for housing PLC and Connections | Includes PLC, fully wired to motors |
| Protective electrical cabinet | Metal, weather-tight, fully wired including protections, magnetothermic (PIA) differential, surge protection (only for the MS TRACKER 10+) |
| Tracking technology | PLC astronomical programming |
| Anti-theft system | Module disconnection alarm |
| Monitoring | Via Internet (OPTIONAL) |
| Inverter | 3 SMA inverters (Sunny Boy 3300) with different power ratings, specially designed for the tracker and installed (only for MS TRACKER 10+) Optional installation offered for other inverters that client may have selected |
| Automation | Totally independent PLC, on each tracking system, with possible remote control and interconnection |
| Upkeep | No maintenance required (yearly revision of mechanical and electrical parts recommended) |
| CE directive compliance | DIN 1055-4 ( 8.86 ), DIN 1056 (10.84 ) and MV-103 Directive |
| Concrete foundation | 7.5 m3 of wire mesh reinforced concrete for 11 kWpFor 8.4 kWp it would be 6.6 m3 |
| Position in the dark and in the fog | Horizontal |
| Recommended solar modules | SolarWorld, ETSolar, Suntech, SunLink, Isofotón, Photowatt, Mitsubishi, Astropower, BP, Kyocera, Sharp, Shell, MSK, etc... |
| Modular surface | 85 m2 |
| Inclination regulation | Mechanical jack |
| Rotation regulation | Motorised bearing for azimuth tracking activated by a planetary gearmotor and an adjustable brake motor that allows for sliding when facing extremely strong winds and which protects the transmission |
| Able to withstand maximum wind speeds of | 130 km/h; if over 70 km/h the structure will assume a horizontal position. Programmable |
| Guarantee | 10 years on Materials and Workmanship |