Skip all menus

News


12/18/2005

MECASOLAR will supply the Murillo el Fruto solar power plant with 168 trackers.

 

The developer OPDE has chosen MECASOLAR MS TRACKER 10+ model solar trackers for the Murillo el Fruto photovoltaic solar power plant in Navarra. This order consists of 168, 8.4 kWp ready-to-install trackers. Each tracker has 175 Wp photovoltaic solar panels (48 panels total) and is supplied with MASTERVOLT series 3 inverters, increasing installation production by more than 35% as compared to fixed structure production capacity. Total power installed amounts to 1.4 MWp.

 


10/20/2005

The developer OPDE has chosen Mecasolar solar trackers.

 

The developer OPDE has chosen MECASOLAR MS TRACKER 10+ model solar trackers for the Murillo el Fruto photovoltaic solar power plant in Navarra. This order consists of 168, 8.4 kWp ready-to-install trackers and 175 Wp photovoltaic solar panels (48 panels total), and includes MASTERVOLT series 3 inverters, increasing installation production by more than 35% as compared to fixed structure production capacity.

 


07/09/2005

10-year guarantee on parts and workmanship

 

10-YEAR GUARANTEE ON PARTS AND WORKMANSHIP This allows us to irrefutably guarantee your investment throughout the installation's amortisation period. Besides this competitive advantage, Mecasolar solar trackers provide another series of competitive technological advantages that doubtlessly position us as one of the top suppliers in the national and European markets. We pride ourselves in speed of construction and ease of assembly.

 


Top
Gifi Fotovoltaica Asociación Empresarial Fotovoltaica Melos Solar Energy Industries Association ®
Iso 14001 Iso 9001